Seattle basement remodeling update

Posted by: | Comments (0)

Things are moving right along on our current Seattle basement remodeling project.  All of the plumbing, HVAC and electrical have been roughed in.  In an effort to keep the cost down the owners elected to leave the existing duct work where it is and soffit them in.  It’s made for quite a convoluted ceiling.  Drywall is underway and we’ve got our doors and trim being delivered so we can pre-stain everything before it gets installed.

Seattle basement remodeling -next steps.

  • Mud, tape, prime & texture the drywall
  • Install tile tub surround.
  • Install bathroom VCT flooring.
  • Install doors and trim (casing and base)
  • Install the bath vanity.
  • Install plumbing trim
  • Install electrical devices and trim.
  • Final inspections.
Comments (0)

Leave a Reply



Download our home owner helper white paper

An itemized approach to planning your construction project and getting qualified bids

Subscribe to Keever and Associates


Subscribe to receive our Seattle Construction musings blog posts via email.


Call Kyle © 206-200-5582