Bellevue remodeling bellevue remodeling contractorsWe are approaching the end of the new bunker garage construction phase of our Bellevue remodeling project on Cougar mountain.  With the waterproofing membrane, drain mat and drainage system complete we buried the garage.  The owner likes the siding we installed during her main home remodel she has asked us to skin the garage with the same clear cedar to match the house.  With the garage buried the yard has quite a bit more real estate and will look great once it’s the grass is planted and landscaping installed.  Now that we’re done using the heavy equipment we demolished the driveway, regraded and installed a new asphalt driveway that looks great.

Bellevue remodeling – new bunker garage next steps:

  • Install guard rails at stairs, parapet walls and retaining walls
  • Install garage door with battery back up opener
  • Install cedar siding on the new garage to match the home remodeling we performed earlier
  • Seal the remaining exposed concrete with a colored sealer.
  • Seal the new asphalt driveway once it has sufficiently cured.
Comments (0)

Leave a Reply



Download our home owner helper white paper

An itemized approach to planning your construction project and getting qualified bids

Subscribe to Keever and Associates


Subscribe to receive our Seattle Construction musings blog posts via email.


Call Kyle © 206-200-5582